to prevent any pressure, washing,
or wasting of the base of the Bank.
Concrete is shown beneath the
base of the Bank
on both sides of the paddle wall. I do not
however see drains indicated
beneath the outer half of the seat of the Bank.
The concrete to receive
puddle wall should not have
a level surface,
but be cross-hatched as under
Bank. Outside Puddle Wall
Bank Inside Drainage
surface Ground
Concrete
The material on
both sides of the puddle wall should be water tight
for 30 feet in width at the least.
This material should be the best
and firmest of the subsoil, specially selected, and be carried up with the puddle wall in thin layers. If walked and trampled during the process of formation,
the embankment will be better consolidated.
The outlet culvert should be
tunnel or made
in solid rock or
of drift-way
and of the ground proposed.
on one side,
proposed. 25 feet above the bottom of the
Reservoir, it may be used as a
water escape during
the progress of the works, and to advantage during flood.
Cross Section of Puddle trench
The Culvert.
This Culvert may be lined
to prevent any pressure, washing,
or wa
wasting of the base of the Bank.
Concrete is shewn beneath the
base of the Bank
Ga
both side
the paddle wall. I do not
however see drains indicated
beneath the outer half of the seat of the Bank -
the
The concrete to receive
puddle woll should not have
a level surface.
but be
G-Cr
Cross lechow
ed as under
✓ formed
Bank. Outside
Puddle Wall
Bank Inside
Dranesy
surface
Ground
Concrete
The material on
both sides of the 175
puddle wall should be water tight
for 30 feet in width at the least.
This material
and
neay
be the best
1 firmest of the subsoil specially selected, and be carried up with the puddle wall in thin layers. If walked and trampled during the process of formation
over
the embankment will be better
consolidated.
The outlet culvert should be
tamuel
Or
solid rock or
drift - way
and of made
d ou
in the
ground
proposed.
am
side,
osed. 25
feet above the bottom of the
Reservoir et
may
be
ace
to provide and use it as a
water escape durin
of the works .
during
advantage flood the progress
Cross Section of Puddle trench
The
This Culvert.
neay
be lined
with
No comments yet.
Private notes are available after approval.